GT45 Drill Rig Rolling Off The Production Line

A new chapter is unfolding in geothermal technology: the first of three new GT45 geothermal & water well drill rigs has just rolled off the production line, and it’s now en route to Europe to begin drilling operations.

This is not just any rig — the GT45 has been purpose‑built with one mission in mind: to deliver high productivity, exceptional reliability, and seamless operation. It’s a rig designed by drillers, for drillers — meaning that every feature and system reflects real-world experience and a deep understanding of what works in the field.

From the outset, the GT45 project has emphasized robustness. Its systems are engineered to withstand demanding geothermal environments, with minimized downtime in mind. Maintenance access is intuitive; redundant systems are built in, and automation ensures consistency and precision. The result? A rig that can drill deeper, faster, and with fewer interruptions than its predecessors.

While the GT45 is optimized for geothermal drilling, its versatility makes it suitable for a range of demanding applications — including water well drilling, mineral exploration, ground-source heat pump installations, and even certain oil and gas support roles. Its robust construction and adaptable systems allow it to perform across various geologies and project requirements.

Keep reading

All news
  1. NEW GEOTHERMAL DRILLING RECORD — 3,216ft IN ONE DAY

    A huge congratulations to 𝗡𝗶𝗰k 𝗖𝗼𝗿𝗻𝗲𝘁𝘁 from 𝗚𝗲𝗼𝘁𝗵𝗲𝗿𝗺𝗮𝗹 𝗘𝗮𝗿𝘁𝗵𝘄𝗼𝗿𝗸𝘀, 𝗨𝗦𝗔, who has just broken the all-time RigLife drilling record, this new record was drilled…

    From the field 2 min read

Get in touch now to discuss how we can improve the efficiency and safety of your drilling operation...

Contact us